RISQ 3.2 Preparation: The RightShip Inspection Readiness Guide
RISQ 3.2 preparation means aligning a vessel's management system, hardware condition, and crew competency to RightShip's revised Ship Inspection Questionnaire, which took effectFebruary 1, 2026 and now runs across 17 sections and 588 questions, including a new dedicated Section 17 on Ship-to-Ship operations. Preparation is not a pre-inspection scramble — it is the same continuous-readiness discipline that underpins SIRE 2.0 and Port State Control, applied to RightShip's own inspection lens.
Charterers increasingly treat RightShip approval as a gate, not a formality. A vessel that can't demonstrate RISQ readiness on demand risks losing fixtures before an inspector ever steps aboard. This guide walks through what actually changed in RISQ 3.2, how the questionnaire is structured, and a readiness checklist your vessel can run continuously — not just when an inspection is booked.
What is RightShip, and what is RISQ?
RightShip is an independent maritime risk-management and due-diligence organization used widely by charterers, oil majors, and cargo owners to vet vessels before fixture. Where SIRE 2.0 is OCIMF's tanker-focused vetting regime, RightShip's due-diligence platform covers a broader range of vessel types — bulk carriers, general cargo, and beyond — using its own inspection framework: the RightShip Inspection and Ship Questionnaire (RISQ).
RISQ inspections examine the same fundamentals PSC and SIRE 2.0 examine — safety equipment, machinery condition, documentation, crew familiarity with procedures — but organized through RightShip's own question set and risk-scoring logic, which feeds directly into whether charterers will fix a vessel at all. A weak RISQ record doesn't just generate a deficiency list; it can quietly narrow the pool of charterers willing to consider the ship.
What changed in RISQ 3.2 (effective February 1, 2026)
RightShip periodically revises the RISQ questionnaire to keep pace with industry risk patterns, and version 3.2 — effective February 1, 2026 — is the current standard.
Per RightShip's RISQ 3.2 update, effective Feb 1, 2026 — figures drawn from research/keyword-map.md §4, not independently re-confirmed against RightShip's own published circular.
Per the research sources available for this page, RISQ 3.2 restructures the questionnaire into 17 sections covering 588 questions total, and runs roughly two hours shorter than the version it replaced, reflecting both streamlining of existing questions and the consolidation of overlapping items.
The exact prior-version question count and a verified section-by-section diff (which specific questions were added, removed, or reworded outside the new Section 17) were not confirmed in sources available for this page — request RightShip's own RISQ 3.2 circular or a verified internal mapping document from Capt. Basu's team before publishing granular change-by-change claims beyond what's stated here.
Section 17 — Ship-to-Ship operations
RISQ 3.2 introduces a dedicated section covering ship-to-ship (STS) transfer operations — mooring arrangements, fender condition, communication protocols between vessels, and crew familiarity with STS-specific emergency procedures. This is a meaningful shift: STS risk was previously folded into broader operational sections rather than assessed as its own discipline. Any vessel that conducts STS operations, even occasionally, should treat Section 17 as a distinct readiness item, not an extension of general cargo-operations preparation.
What this means for a vessel already RISQ-familiar
A crew that was drilled on the pre-3.2 questionnaire cannot assume the same preparation transfers cleanly. The shorter overall length doesn't mean less scrutiny — it means the questions that remain are more tightly targeted at what actually predicts risk, which raises the bar on how well a crew needs to know the reasoning behind a procedure, not just the procedure itself.
RISQ 3.2 vs SIRE 2.0 and PSC — same discipline, different questionnaire
RISQ 3.2, SIRE 2.0, and Port State Control are not competing standards a vessel juggles separately — they are three different lenses examining largely the same underlying readiness. A vessel with genuinely strong bridge procedures, well-maintained fire and life-saving equipment, and a crew that can demonstrate (not just describe) emergency response will perform well across all three, because the underlying discipline is identical even when the question wording, scoring model, and institutional owner differ.
The practical implication: a fleet training toward "pass the next inspection" for whichever regime is due next builds a shallower, regime-specific readiness that has to be relearned for the next framework. A fleet training toward continuous operational readiness — the same standard demonstrated the same way every day — is simultaneously RISQ-ready, SIRE 2.0-ready, and PSC-ready, because the readiness itself, not the questionnaire, is the real target. See the parallel SIRE 2.0 readiness guide and Port State Control preparation guide for how the same zones and disciplines map across all three regimes.
| Discipline | RISQ 3.2 | SIRE 2.0 | Port State Control |
|---|---|---|---|
| Documentation & certificates | SMS procedures verified against the 17-section RISQ 3.2 structure; certificates and class records checked for currency. | SMS and certificates checked against OCIMF’s CVIQ-aligned criteria; PIQ answered from the same structured data. | Safety Management Certificate, Load Line, and class records reviewed first, before the physical walk-through begins. |
| Bridge & navigation | Passage planning and ECDIS operation tested under RISQ’s navigation-systems coverage. | Officer of the watch demonstrates procedures under CVIQ human-factor criteria. | Chart correction status, ECDIS/radar operability, and emergency steering changeover demonstrated on request. |
| Engine room & machinery | Engine room log accuracy checked against actual running hours and maintenance records. | Machinery condition and crew familiarity assessed through SIRE 2.0’s human-factor lens. | Emergency generator start-up, bilge alarm and oily-water separator function-tested. |
| Fire safety & LSA | Fire pump, extinguishers, lifeboat/davit systems, and EPIRB/SART dates checked. | Crew demonstrates drills, not just logs them, under CVIQ scoring. | Crew runs an abandon-ship drill on request, not just on schedule. |
| Cargo & pollution prevention | Cargo system integrity and pollution-prevention records reconciled against actual operations; Section 17 covers ship-to-ship transfers. | Cargo systems and pollution-prevention practice assessed against tanker-specific vetting criteria. | Oil record book entries reconciled against actual cargo/bilge transfers; pump room gas-free certification checked. |
| Crew demonstration | Crew asked to explain the reasoning behind a procedure, not just recite it. | Crew interview readiness — officers rehearse the questions before the vetting inspector asks them. | Crew demonstrates, not describes: operate the emergency fire pump, explain the muster list. |
Why RISQ readiness affects more than the inspection itself
A RISQ inspection outcome doesn't stay contained to a single report. RightShip's due-diligence platform is consulted by charterers, oil majors, and cargo owners as part of routine vessel vetting before fixture — so a weak or dated RISQ record can quietly narrow the pool of charterers willing to consider a ship, long before any single voyage is affected. Unlike a PSC detention, which is a discrete, visible event tied to one port call, a poor RISQ standing works more like a persistent drag on commercial opportunity — the kind of cost that never shows up as a line item but shows up in which fixtures never get offered in the first place.
This is why treating RISQ 3.2 preparation as a one-time event before a known inspection window under-serves the vessel. A ship that maintains continuous readiness carries a RISQ record that reflects genuine, current condition whenever a charterer checks it — not a snapshot dressed up for an inspector who happened to be scheduled that month. The commercial upside of readiness compounds the same way the commercial cost of neglect does: quietly, and over time.
See RISQ 3.2 readiness on your own fleet.
A 30-minute walkthrough of how Guide2Inspections maps Section 17 and the rest of RISQ 3.2 to the zones your crew already trains on.
How a RightShip inspection actually runs, section by section
A RISQ inspection, like a SIRE or PSC inspection, moves from documentation into a physical walk of the vessel, checked against the questionnaire's structure. Inspectors verify certificates and management-system records first, then move zone by zone — bridge and navigation, engine room and machinery spaces, cargo and mooring systems, fire safety and life-saving appliances, accommodation, and — as of RISQ 3.2 — ship-to-ship operational readiness where applicable. At each stage, the inspector is testing whether the crew can demonstrate the procedure the SMS describes, the same test that runs through SIRE 2.0 and PSC inspections, applied through RightShip's own scoring lens.
The questionnaire's 588 questions are not evenly weighted in practice — inspectors spend disproportionate time where the vessel's own history, age, or type suggests elevated risk. A bulk carrier with a recent history of cargo-related deficiencies should expect closer attention to cargo and mooring systems; a vessel with prior machinery-related findings should expect the engine room walk to run longer and probe deeper. This is consistent with the risk-based targeting logic that also shapes PSC inspection frequency — the questionnaire structure is fixed, but where an individual inspector spends time is shaped by the vessel's own record.
Common gaps that surface during RISQ inspections
Across the disciplines RISQ examines, a small number of gap patterns recur regardless of vessel type. None of these are unique to RightShip's questionnaire — they are the same readiness gaps that show up in SIRE 2.0 and PSC inspections, which is exactly why a zone-based, continuous-readiness approach serves all three regimes at once rather than requiring separate preparation cycles:
Bridge and navigation management
Passage-planning documentation that doesn't match the actual voyage, or bridge officers who can describe ECDIS procedures but aren't fluent operating the system under inspection pressure.
Machinery and engineering records
Maintenance logs that are current on paper but don't reflect what the engine room team can demonstrate when asked to run a system live rather than describe it.
Cargo operations and mooring
Mooring line and winch condition, fender readiness, and — under RISQ 3.2's new Section 17 — whether the crew has specifically rehearsed ship-to-ship communication and emergency protocols, not just general cargo procedures.
Safety management and documentation
The same ISM-thread gap that runs through PSC inspections: an SMS that describes a standard the crew hasn't actually internalized.
Crew competency and the human factor
Whether officers and ratings can explain the reasoning behind a procedure, not just recite the steps — RISQ 3.2's tighter, streamlined question set puts more relative weight on this kind of depth.
Environmental and pollution-prevention practice
Oil record book entries, gas-detection equipment, and waste-management records reconciled against actual operations rather than routine paperwork.
A RISQ 3.2 readiness checklist you can run before every inspection window
Frequently asked questions
What is RISQ 3.2 and when did it take effect?
RISQ 3.2 is the current version of RightShip's Inspection and Ship Questionnaire, effective February 1, 2026. Per the sources used for this page, it restructures the questionnaire into 17 sections and 588 questions total.
What changed between RISQ 3.0/3.1 and RISQ 3.2?
The headline change is a new dedicated Section 17 covering ship-to-ship (STS) operations — previously folded into broader operational sections. The overall questionnaire also runs roughly two hours shorter to complete, reflecting streamlining of the question set.
How many sections and questions are in the RISQ questionnaire?
RISQ 3.2 (effective Feb 1, 2026) is structured across 17 sections totalling 588 questions, per the sources used for this page.
How do I prepare a bulk carrier for a RightShip inspection?
The same continuous-readiness principle applies regardless of vessel type: keep certificates and SMS documentation current, run zone-based self-audits between inspections rather than only before a known one, ensure the crew can demonstrate procedures rather than just describe them, and close out prior deficiencies with evidence before the next inspection. Bulk carriers conducting ship-to-ship transfers should treat Section 17 as a distinct preparation item under RISQ 3.2.
What is the difference between RightShip and SIRE inspections?
SIRE 2.0 is OCIMF's tanker-specific vetting regime; RightShip's RISQ inspection covers a broader range of vessel types (bulk carriers, general cargo and beyond) through its own independent due-diligence questionnaire, feeding into charterer risk assessments rather than OCIMF's programme. Both examine largely the same underlying readiness — safety equipment, machinery condition, documentation, and crew competency — through different question sets and institutional owners.
A full section-by-section diff beyond Section 17 (what changed between RISQ 3.0/3.1 and RISQ 3.2, question by question) was not confirmed in sources available for this page — request the verified mapping from RightShip's own circular before publishing it.
Ready before RightShip asks.
A 30-minute walkthrough with a master mariner — your trades, your vessel types, your next RightShip inspection window.








